Request:
- Update the selected analyst reports so stock/company names include Chinese names and use Chinese names first.
Changes:
- Updated the selected T0 reports for 01392, 06067, 06106, and 06132 to show Chinese company names in the title and summary, with English names in parentheses.
- Added company_name_zh to the analyst dataset so report generation has access to Chinese names.
- Updated the report generator to prefer Chinese company names and fall back to English names only when Chinese names are unavailable.
- Filled Chinese company names for the selected tickers in ipo_master and refreshed snapshots.
Verification:
- Compiled build_analysis_dataset.py and generate_ipo_report.py.
- Ran generator dry-runs for 06132 and 01392 to confirm Chinese-first output.
- Ran SQLite integrity_check and foreign_key_check.
- Ran git diff --check.
Next useful context:
- Future generated analyst reports now use company_name_zh first when available.
Request:
- Make analyst reports Chinese by default and record the rule in the analyst skill.
Changes:
- Add a Simplified Chinese default-language rule to the analyst skill.
- Update the single-IPO report generator to emit Chinese Markdown sections, labels, actions, risks, triggers, and exit plans.
- Preserve ticker symbols, stage codes, rule ids, score buckets, and source paths as machine-readable identifiers.
- Regenerate the 06106 T0 report in Chinese.
- Document the Chinese report default in README and the rule change log.
Verification:
- Ran py_compile for scripts/generate_ipo_report.py.
- Generated a 06106 dry-run report and checked Chinese section headings.
- Regenerated reports/2026-06-15_06106_T0_prospectus_analysis.md.
- Ran git diff --check.
Next useful context:
- Future analyst prediction and review reports should be written in Simplified Chinese unless the user explicitly requests another language.
Request:
- Include the concrete T0, T1, T2, and D1 dates in every analyst report.
Changes:
- Add a Stage Calendar section to the single-IPO report generator.
- Require analyst reports to include ticker-specific T0 subscription window, T1 allotment-result date, T2 grey-market date/window, and D1 listing date.
- Update the 06106 T0 report with its concrete stage dates.
- Document the requirement in the analyst skill, README, and rule change log.
Verification:
- Ran py_compile for scripts/generate_ipo_report.py.
- Generated a 06106 dry-run report and checked the stage calendar.
- Ran git diff --check.
Next useful context:
- For 06106, T0 is 2026-06-15 to 2026-06-18, T1/T2 is 2026-06-23, and D1 is 2026-06-24.
Request:
- Emphasize that the analyst model is for selling allocated IPO shares in T2 grey market or on D1, not for long-term holding.
Changes:
- Add explicit T2/D1 sell discipline to the analyst skill.
- Update ipo_score_v0 targets and holding policy so D1 sell return is primary and T2 is the intended extension when reliable grey-market data exists.
- Clarify that D5/D20/D60 are review labels only, not planned holding targets.
- Update the model report, single-ticker report generator, README, and the 06106 report language to reflect the short-exit horizon.
Verification:
- Rebuilt the model report with the same dataset timestamp and confirmed the analysis dataset did not change.
- Ran py_compile for build_analysis_dataset.py and generate_ipo_report.py.
- Generated a 06106 dry-run report showing T2/D1 exit discipline.
- Ran git diff --check.
Next useful context:
- T2 is still disabled in v0 until archivist approves a reliable grey-market data source; D1 remains the live modeled sell label.
Request:
- Use the analyst skill to analyze upcoming IPO 06106 and generate a Markdown report.
Changes:
- Add a stage-safe T0_prospectus analyst report for 06106.
- Record the v0 score, calibrated historical probability, key T0 positives, risks, triggers, and source path.
Verification:
- Confirmed 06106 has no structured T1 demand yet, so the report is T0_prospectus.
- Reviewed the report for stage safety and repo-relative source paths.
- Ran git diff --check.
Next useful context:
- Re-run analyst after 06106 allotment results are archived around 2026-06-23 to generate a T1_allotment report.